Report on test protocols for cell and stack test (D5.1)

The deliverable “D5.1 Report on test protocols for cell and stack test” presents the test protocols that will be used as guidelines for all the cell and stack test during the project.

In the PilotSOEL project, cells with different processing methods, interdiffusion barrier layer, electrode microstructure and stacks with different components, assembly processes will be evaluated.

It is thus important to be able to compare the performances of different cells and stacks, to evaluate the influences of those variations on the cell and stack performances and identify the key parameters for manufacturing high performing SOEL cells and stacks. Harmonized test protocols for both cell and stack are therefore made to ensure that all the cells and stacks are tested under same conditions or same selected conditions, so to ensure a better comparison of the test results.

Read the full report here.